One of the advantages of wooden houses is their slight weight relative to brick ...
One of the advantages of wooden houses is their slight weight relative to brick ... |
In Khrushchevs and other buildings of the Soviet era, low problems are considered a big problem ... |
Each owner of the land seeks to equip it in accordance with his ... |
Repair of a removable formwork is an important process that must be carried out regularly. It is quite easy to do this to have some construction tools and a basic idea of \u200b\u200bthe work technology itself. The article is devoted to how to correctly align, exploit, dismantle and store the formwork.
The foundation is the basis of the entire structure. The durability and fortress of the dwelling depend on the quality of its construction. When arranging the base of the house, the formwork will play an important role. Its main task is to give maximum strength the constructed structure. In this case, the formwork must comply with a number of requirements:
During construction, two types of formwork are most often used: removable and monolithic.
Removable formwork A rather practical option, implying the dismantling of a temporary structure after grasping or final solidification of the working solution. The use of such formwork allows you to form different configurations for filling with concrete, equip high -story facilities, stairwells, decorative elements for decorating an exterior and interior.
Removable formwork is made of plywood or metal sheets, an array of wood or polyvinyl chloride. The material should have a weak coupling with concrete solution. After dismantling the holding structure, if necessary, the foundation formwork is repaired and the material is ready for re -use.
Non -removable formwork systems If the solution is hardened, they become part of the constructed structure. Various thermal insulation materials are used to arrange formwork of this type. As a result, a multilayer wall is formed, where the frozen concrete is responsible for the strength characteristics of the structure, and the insulating layer reduces thermal conductivity and helps to retain heat inside the building. Non -removable formwork provides effective protection of concrete from moisture.
Today, during the construction of the house, it is not necessary to independently make formwork on its own. Sometimes this option is cheaper than the construction of formwork from scratch. Companies that provide formwork for rent often offer technical support of the project:
In the process of construction work or, upon completion, formwork repair may be required. Before repeated use, it is necessary to inspect the formwork, it must have even geometry and be clean.
Important! Regardless of the frequency of use and the type of formwork, its repair should be carried out in a timely manner. The damaged formwork of floors and walls complicates the work of the builders and reduces the quality of the constructed structure.
Little repair of formwork for monolithic construction is carried out at the construction site and may include:
Serious malfunctions require repair of formwork of ceilings, walls in a technical workshop. Correct or replace steel shields, using only improvised means, you will not work for repair special equipment.
The capital reconstruction of the formwork extends its life by 50%. Specialized companies are ready to carry out a comprehensive repair of formwork of walls and foundation. At the same time, many firms expenses for the removal of formwork and delivery of a repaired construction structure are assumed.
In order for the formwork to be used in the future, it is necessary to correctly perform not only its installation, but also the removal. The flooring is carried out according to the following rules:
Estimated terms for removing formwork are presented in the table.
General order of packings:
Important! The upbringing ceiling can be loaded only after reaching the concrete design of the design strength.
The disassemble and outflowing formwork before repeated use must be checked for defects and prepared. The recommended measures include:
Important! Deformations (rupture of clamps, bulging structural elements) detected after pouring a concrete solution should be eliminated within three hours after the formwork is filled. After this time, any intervention in the enclosing structure is prohibited so as not to reduce concrete strength.
Repair of formwork at home with your own hands: video
When erecting a house, it is important to control that the foundation and side walls are as smooth as possible. These criteria are especially important in places of insulation laying. In areas where convex places and pits are allowed, it will not work to place the wall material qualitatively. The penetration of moisture is possible into the resulting cavities, and the wall will gradually begin to collapse from the inside.
To align the horizontal plane of the foundation, you need to have at hand some materials and tools:
Alignment of the strip foundation. To correct the horizontal of the base, you will have to increase the formwork on the side walls. When lifting more than 5 cm, you need to strengthen the structure using a reinforcing grid.
To mark the boundary altitude height will turn out in several ways:
The alignment of the columnar foundation. The horizontal position of the brick, pipe or concrete column foundation is aligned by analogy with the strip base. Formwork is used to increase. The surface of the pillars is level under one horizontal plane. With significant drops, you need to strengthen the formwork.
Metal pipes foundation It equals the smallest height. Excess material is cut by a grinder.
The durability of the formwork system largely depends on the conditions of its savings and transportation. Shields are placed in dry warehouses protected from the effects of negative natural factors and mechanical damage.
Combined or steel formwork is placed in closed rooms equipped with a concrete base. Small shields can be stored with two tiers. Between the layers you need to lay the bars or boards. Bulstarite shields are laid in one tier. Fights, racks and other equipment are stored on equipped shelves. Various small details are packaged in boxes.
A wooden formwork is allowed to save under the cover. It is advisable to place the warehouse in an elevated area where rain and groundwater do not stagnate. Shields are folded in stacks in one direction. Bars of about 20 cm thick are necessarily placed on the ground. The height of the stacks is maximum 2 meters.