The bulk floor is a special type of floor screed. Its main feature is that the thickness of the leveling layer can be from 1 mm to 30 50 100 mm. This technology has other names of the flood floor, aligning the screed by a self -leveling mixture and naughty. Another feature of the bulk floor is the ability to make a finished mixture to be self -made, i.e. spread in an even layer, without leaving cracks, gaps, height changes and air bubbles. It is the property of forming an almost perfectly flat surface and determines where a self -enlightening bulk floor is used. Basically, this is the finish leveling of the surface before laying such flooring as ceramic tiles, laminate, linoleum, carpet, parquet board and piece parquet. The flat surface of the floor not only facilitates the laying of finish flooring, then to a large extent determines the strength of their consolidation and durability in use. There are also self -enforcing mixtures that are used to arrange the finish coating. These are the so -called glossy and matte bulk floors, 3D floors that can imitate natural materials, stones, and also have multi -colored drawings. Working with such mixtures is not so complicated, so you can safely make a self -enforcing bulk floor with your own hands.
Self -leveling floors are durable, exceptional strength, wear resistance and resistance to mechanical damage and loads, they are also not afraid of moisture and dust. The assortment of self -enforcing mixtures is huge, they differ in the thickness of the layer, strength, drying time and crack resistance. You can apply a self -enforcing bulk floor on the following grounds:
Working with a self -burning mixture is easier than with a conventional screed solution. It is easier to knead, is easier to apply and level, dry faster, and in the end it turns out a more even and strong coating. It is difficult to make a poor -quality bulk floor, but it is possible. As in any business, there are also nuances in working with self -combating mixtures, the non -compliance of which can lead to cracking of the coating. Next, we will consider the detailed technology of floor filling, paying special attention to the nuances.
For independent filling the floor with a self -burning mixture, some tools and materials will be needed:
All of the above can be bought at any construction store or supermarket. Almost all materials are useful for further repair.
When arranging a bulk floor, the preparation of the surface for it is the most responsible and important stage. If you do not follow the difference in heights, the level of moisture of the black floor, do not remove oil spots from the surface, then all further efforts can be useless. Therefore, pay close attention to the preparation and observe the technology.
To prepare the base, which is a concrete floor, a reinforced concrete floor slab or a black concrete screed, the following must be performed:
Important! If the black concrete screed or monolithic concrete floor was recently flooded, then you can equip the bulk floor only after a month, when the concrete takes maximum strength and dry enough.
Before starting further work, the surface of the concrete floor should be dry, even and without cracks and potholes.
The danger of using a wooden floor as a basis for filling the bulk floor is that a liquid mixture can seep through the cracks between the boards. Also, if the wooden floor is faulty, creaks, then after filling the municipal mixture, the problem will not disappear, or may even worsen. That is why the wooden floor must first be carefully checked for serviceability, inspect and repair. Thereafter:
Please note that all repair solutions should dry before filling the self -leveling mixture.
It seems to many that the use of self -enforcing mixtures does not involve the installation of lighthouses, as if the solution itself is spreading into a flat layer and occupies all the necessary area. In fact, everything, unfortunately, is not so rosy. As reviews are shown to a self-enlightening bulk floor, a solution, although more fluid, in comparison with the usual solution for cement-sand screed, is still not spreading with an even layer without outside help. Well, for example, imagine that you have poured a can of mayonnaise on the floor, because it will not grow up with an even layer, as well as self -combating mixtures. Therefore, if you want a really flat floor, install the beacons.
The room must be marked so that the distance between the lines of the lighthouses does not exceed 1.8 m so that the rule can be easily leveled by installing it by installing it on the beacons. The lighthouse closest to the wall should be located at a distance of 50 cm from the wall.
Self -tapping screws, metal pipes or square profiles guides for plastering can be used as lighthouses, and you can make beacons from a repair cement mortar, then they will not have to be removed. Consider this option:
As a result, smooth paths from the solution that will serve as beacons are obtained. In fact, there are mixtures for which the beacons do not need to be installed, in any case, the manufacturer states. Keep in mind that on the rocking of the room you must put a barrier in the form of a wooden rail so that the mixture does not flow outside the room.
After preparing the surface and installation of lighthouses, you can start filling a self -burning bulk floor. The technology of filling and preparing the mixture has a number of nuances that should be paid to.
To close all the pores in a concrete or wooden base, improve the spreading of the mixture, increase the adhesion of the solution with the base and reduce the likelihood of the appearance of bubbles, the surface of the floor must be loaded. The temperature in the room in the process of soil work should be constant, in extreme cases, a decrease in temperature is allowed. If the temperature rises, the appearance of bubbles is possible.
Important! For priming highly porous bases, such as wooden, high -skinned primers are used.
Grinding is carried out in two stages (2 layers). You should not save on a primer, otherwise a self -enforcing floor will have irreparable flaws and you will have to remove it:
Important! After applying the first layer, it is necessary to observe how the primer behaves. If there are bloating and bubbles, then the floor was not dry enough. In this case, the floor should first be dried and then continue applying the primer.
You can continue work only after the soil dries. Experts recommend not waiting for more than a day, but to continue work after 4,20 hours.
The time of solidification of mixtures for the bulk floor is quite small up to 1 hour, so it is necessary to prepare the solution only before the start of work. The required number of people should also be calculated. For example, one person will cope with the floor filling in the standard bathroom, but for the floor in the room you will need 2 3 people. We take a bag of mixtures, for example, a self -leveling floor of Bergauf Easy Boden. Please note that the instruction for your mixture is a priority compared to the below below. Be sure to read the recommendations of the manufacturer.
Important! The main feature of the self -burning bulk floor is that to prepare the mixture, it is necessary to fill the dry component of the mixture into the water, and not vice versa.
Preparation technology for a self -leveling mixture:
Checking the mixture mixture:
It is extremely important not to overdo it with the addition of water. If there are too many of it, then cracks or stratification may appear in the bulk floor, and the floor will also slow down.
During the application of a self -burning bulk floor, it is necessary to observe the temperature and humid regime. The temperature in the room should be from +5 to +25 C, the temperature is considered optimal +15 - +25 C. The humidity should not exceed 80 %, otherwise it is likely that condensation will appear on the surface of the floor.
Please note that the mixture begins to harden already 40 minutes after cooking, so the gap between the fills should not exceed 10 minutes. The floor in the entire room must be poured without breaks. So that the prepared mixture does not dry out, it must be kneaded in parts depending on the performance of the workers' brigade. It is advisable for beginners to knead a little.
Filling a bulk floor:
Important! To walk on the floor, flooded with a self -burning mixture, the so -called spikes with spikes, which can be worn on top of ordinary shoes, are used. Walking in paintings also helps to remove air bubbles from the mixture.
After pouring a self -burning bulk floor, it is necessary to wait for its drying. By evening, a slightly frozen floor can be covered with plastic film so that water evaporates more slowly. So less likely to crack the surface. The time of hardening the bulk floor is about 3 days: in a day you can walk on it, but fully used only after 3 6 days. The finish flooring can be laid on top only after 5 6 days, when the mixture completely dries and hardens.
If pipes or profiles were used as beacons, they must be removed 3 4 hours after filling the mixture and fill the voids with a new solution of a self -burning mixture. In the considered case, the beacons are part of the general design of the leveling screed. If a warm floor is equipped on top of the system, then it can be connected no earlier than 7 10 days later. If a self -burning bulk floor was flooded as a finish coating, then its surface can be opened with varnish.
Great article! To me, how
Great article!
As a girl, everything was extremely clearly described to me!
Thank you!
In great detail. Steel became clear
In great detail. Incomprehensible questions became clear.
i learned about the neighbors on
i learned about the neighbors on the next day of the loggia how to wash glass and plastic