In order to conduct supporting walls of the frame house, necessary...
In order to conduct supporting walls of the frame house, necessary... |
Modern industry offers a membrane to cover the PVC roof, which has ... |
Polymer -old tiles are a new building material, which is offered on ... |
If the floor of wood began to creak, there are rotten boards or some other deformations, then repair work is required before performing linoleum laying. Repair begins with the fact that all the boards are completely removed, and the lags are also dismantled. The nails are immediately cleaned aside, since the mounting of the boards to wooden lags will be performed using self -tapping screws. The rotten wood must be thrown away to plywood under linoleum It was laid high quality.
Further, along the entire area of \u200b\u200bthe room, it is necessary to beat off the horizontal straight line, as well as measure the distance from this line to the floor surface. As a result of the measurement, the highest point is determined. This point is necessary, since it is from it that the mounting of the lag and plywood under linoleum will occur in the future. In other words, put the lag to it and install the mark. The same marks must be placed around the entire perimeter of the room. Then, you should connect these marks with straight lines. In order for the line not to be distorted, it is necessary to use the level or a long and even stick.
Before using logs, wood and plywood boards, they need to be covered with a specialized substance that will prevent the appearance of harmful microorganisms and protects from bark beetles. Then for some time they should dry.
One of the main properties of wood is absorption of moisture. Because of this, it is often supplemented with plywood. In order for the wood to be not very moisturized, it is also necessary to process the screed using a specialized substance. So, it contributes to the fact that all moisture begins to crystallize.