Put the bulk of the wave of the wave - instructions with examples, video

The wave of the wave of the wave creates a perfectly flat flooring surface without much effort from the person performing the work of a person. Due to its liquid consistency, the mixture for bulk floors spread horizontally, evenly filling all the irregularities and creating the perfect level. The Volma company began its work more than 50 years ago. The first product of gypsum plaster released by it. Now in the assortment line of the company there are dry mixtures for repair and construction.

Table of contents:

  1. Varieties of mixtures from the company Volma
  2. Basic floor mixture of the wave of an apart rude
  3. Wolm's bulk floor of the Volma Expert
  4. Advantages of the bulk bulk floors
  5. Surface preparation work for bulk floors
  6. Preparation of the Wolm Flood Work Fleet Revevel Express
  7. Filling the bulk floor of the Volma Levelir Express
  8. The execution of the screed with a mixture of the Volmee is rude

Varieties of mixtures from the company Volma

Demand for ready -made dry mixes is growing every year, as workers appreciated the convenience of dissolving ready -made components, without selecting them in the necessary proportion. For different types of work, the requirements for the mixture differ from each other are presented. Therefore, the manufactured products differ in some key indicators. Two main types of mixtures for the bulk floor are distinguished:

  • With the basis of cement. This type of mixture is the most widespread, as it corresponds to the classic recipe for the floor screed, which has been used for decades. The advantage of the cement screed is that it evens the most complex surfaces and is used as a preparatory layer for finishing work.

  • With the basis of gypsum. It is on this basis that bulk floors are made. Mixtures with a gypsum base are used for finishing flooring. Its advantage is that when working, it is not necessary to perform complex preparatory work and put the coating on the base.

The mixtures from the Volme company are presented in a wide assortment, among them two brands of rude and level of express expresses are especially distinguished.

Basic floor mixture of the wave of an apart rude

This brand is represented by a dry mixture consisting of various components. The basis of the mixture of cement, lime with fillers from natural raw materials and chemical additions, is strengthened by fiber. The advantages of the mixture in a relatively small shrinkage, strength and high -quality adhesion to the base. The coating withstands low temperatures, is easily applied, polished and aligned, due to its plastic properties. The work is carried out for a relatively short period, since the mixture quickly freezes and forms a strong layer of coating.

The mixture is used rough during initial work as the starting finishing layer. Suitable for the base of concrete and cement, with a thickness of 10 to 80 mm, in some cases a layer of up to 100 mm is allowed. Using the mixture, repair work is carried out on the surface, eliminating cracks, as well as aligning it.

Wolm's bulk floor of the Volma Expert

The brand is represented by a dry mixture, which is based on quartz sand with an astringent effect, thanks to it the solution is very mobile when performing work and is very durable after solidification. Using the mixture, the surfaces are aligned with a thickness of 5 to 100 mm. It is used on the basis of concrete or cement as a finish coating on which decorative elements are placed. Suitable for use in residential and industrial buildings, it is used only when indoor work. It is applied manually or using special mechanisms.

In addition to quartz sand, the mixture includes modifying additives, thanks to which the mixture after drying is very strong, and the time of work is reduced. The mixture freezes on average in 4 hours, and the load on the bulk floor is allowed after 72 hours. The working temperature of the solution is from +5 to +30 ° C. Another advantage of the products of the Volma Paul price price. The cost of packaging 20 kg on average is 6 EUR.

Advantages of the bulk bulk floors

In general, all the products of bulk floors from the company Volmar have 4 main advantages over other brands:

  • The mixture diluted in the correct proportion has a liquid consistency. The density and consistency of the solution is regulated by the amount of fluid added to it. The mixture in the optimal ratio of dry part and water itself is leveled on the surface, without creating difficulties when laying a decorative layer.
  • The cost of a bulk floor from the Volma company is much lower than the price of imported brands. At the same time, the quality of the mixture has established themselves among consumers at the highest level.
  • Dry mixtures for the bulk bulk floor are treated with a manual or machine method, which is not available to most other mixtures. As a rule, other mixtures are suitable for only one type of processing.
  • The mixture adds polymer components that increase the service life of the floor, increasing its strength. After a period of 7-14 days, when the mixture has completely frozen, it withstands increased loads with an indicator of up to 12 MPa.

Surface preparation work for bulk floors

As mentioned above, the bulk floors and starting mixtures of the Volma fit without much effort and create a perfectly smooth surface. But for high -quality work, it is necessary to consider all the stages of surface processing on a specific example. The first example is the laying of the wolf bulk of the Volme, the level of the express on the floor from cement from the oil painted. The irregularities in depth reached up to 1 cm and were located along the entire surface around the perimeter and at the joints of the floor of the plates. To begin with, the surface is prepared for work.

The first step in the floor cleaning. It is necessary to carefully follow so that the base is perfectly clean. The presence of stains of oil or fat, traces of paint and other contaminants, which reduce the level of clutch of the bulk floor with the surface, is especially unacceptable. On the floor, all areas that crumble or exfoliate are cleaned, or simply have a bad hitch with the base. This is necessary so that the bulk mixture does not proceed under the lower layers.

The floor is cleaned of dust and dirt, perform these works very carefully. First, dry cleaning with a vacuum cleaner or broom is carried out, and then washed the surface with a damp cloth until it is completely cleansed. The purified surface is left to dry, and then treated with primer material. This step is necessary to give the surface of a small roughness, which improves the clutch of the finish processing with the base. Optimally, non -contact soil or any other that the manufacturer of the bulk floor is recommended for these works. The primer is applied to the surface with a brush or roller. When working on a large surface, it is optimal to use a roller, this will help to significantly reduce the time of work.

The room in which the floor will be poured is carefully prepared. This consists in ensuring optimal conditions for the performance of work. The created conditions must be preserved until the already flooded floor is completely solidified in order to ensure its strength. In the room, the negative air temperature is unacceptable, the optimal indicator is from +5 to +25 ° C. The windows and doors in the room are closed tightly and ensure their tightness, in order to avoid drafts. During the drying of the mixture, drafts are also unacceptable.

Preparation of the Wolm Flood Work Fleet Revevel Express

After preparing the surface, a solution for filling is prepared. The packaging of the mixture necessarily contains an instruction that explains in detail how to breed it. In this particular example, the floors were prepared as follows:

  • The packaging of dry mixtures contains 20 kg.
  • About 5.6-6.2 liters of water were poured into a large container.
  • An approximate calculation of fluid per 1 kg of dry mixture is 0.28-0.31 liters.
  • The entire volume of powder contained in the package was poured into a container with water.
  • The solution was well stirred with an electric drill with an interference installed on it.

When stirring, the mixture is carefully monitored that it does not contain clots and lumps, has a homogeneous structure and consistency. The mixture is prepared 15-20 minutes before the work. With debut pouring, it is not recommended to immediately breed the entire volume of the mixture. It is more rational to cook it gradually, training in small portions. If you dilute the mixture with hot water, its setting time will decrease. Pouring more fluids in powder than the manufacturer recommends, the risk of reducing the strength of the finished floor increases.

Filling the bulk floor of the Volma Levelir Express

To fill the solution on the floor, you will need a set of tools:

  • The spatula is used to distribute the mixture.
  • A needle roller on a long handle is used to remove air bubbles from the mixture. During the leveling of the roller, the bubbles are pierced and all the air leaves.

The mixture begins to pour from the farthest relative to the entrance of the angle of the room. The fill algorithm looks like this:

  • The mixture is poured into the floor with a narrow strip.
  • With a spatula, the solution is evenly leveled on the surface.
  • The solution is applied so that it fills all the depressions in the surface and create a perfectly even layer.
  • Carefully monitor the appearance of air bubbles in the mixture and remove them using a needle roller.
  • The roller passes on the surface of the flooded mixture so that it diverges on the plane evenly. The result is a flat surface with a glossy shine.
  • Having distributed the first strip on the floor, they begin to fill the next, which is located parallel to the neighboring.
  • The procedure is repeated by the strip behind the strip until the entire surface is covered with solution.

The Volma Rasmoor Halm, the flow rate has 4 kg per 1 m2, provided that the thickness of the layer is 5-7 mm. About 8 bags of dry mixture are needed in the room with a quadrature of 40 m. One bag contains 20 kg of product, that is, 160 kg of dry mixture for the floor is needed for the room. The surface will completely grasp after 8-10 hours, and loading it with furniture and other elements is allowed only after 2-3 days.

The execution of the screed with a mixture of the Volmee is rude

Preparatory work for laying a rude tolete does not differ from the likes for laying a bulk floor:

  • Get rid of poorly holding on the basis of areas.
  • The surface is cleaned of fat spots.
  • Wash.
  • Grind.
  • Dry.

The conditions for the performance of work also do not differ from 5 to 30 ° C, the absence of drafts. The primer for the surface of the concrete is selected universal, for bases with a high indicator of absorption of aqua moisture. If necessary, the primer is applied in two layers with a temporary interval between work at 2 hours. The gap between the primer and the installation of the floor is 1 hour. These indicators are relevant only for rooms with normal humidity, for rooms with high humidity, time increases.

Algorithm for laying the equalizer:

  • Lighthouses are installed. One horizontal line is measured in level, small piles of the solution are laid along this line, in which the beacons are installed. Check the evenness of the lighthouse line. The solution used for this procedure is treated with a primer.
  • Prepare a solution. Pour into a large container water with a temperature of +5 to +20 ° C. The proportions for the mixture are 0.13-0.15 liters of water per 1 kg of dry mixture.
  • A measured amount of powder is gradually poured into the water, while stirring the solution. Filling is carried out in small portions, each of which is given 5 minutes for the complete dissolution of all components. During these five minutes, the solution does not interfere.
  • A completely ready -made mixture must be used no later than after 2 hours. It is unacceptable to dilute the mixture with water in excess of the specified amount, since in this case cracks and detachment will appear on the finished screed.
  • The mixture is laid between the beacons with the help of ironing.
  • The trapezoidal rule is leveled by the level of lighthouses.
  • Leave a mixture completely laid out on the floor for 7.5-8 hours, and then pass along it with a plastic grater to achieve perfect evenness. The surface of the screed with this is slightly wetted with water.

At temperature mode in the room, about +20 ° C becomes suitable for operation 7 hours after laying. Completely the screed dries only after 3-4 weeks. The floor is allowed to decorate, 3.5-5 days after pouring the floor. The spinning floor of the Volma is easily and very simply fits, reviews from consumers only confirm its practicality and quality.

 

 
0

 

Comments

(IF You're a Human, Don 'Change the Following Field)
YOUR FIRST NAME.
Anonymous ( fast registration on the site)

Used the alignment,

He used the alignment when he did the repair of the house - a good mixture, no complaints about quality! The domestic manufacturer is pleasantly surprising.

The leveling is perfectly spreading,

The leveling is perfectly spreading, it is very pleasing, as well as the ability to operate the floor on the full after a couple of days.

After the winter, cracks went on

After the winter, cracks throughout the floor here are the result https://youtu.be/pzj-d7a0zhe

If more than 4 centimeters

If more than 4 centimeters pour over the overlapping floor how long it takes to dry