The wave of the wave of the wave creates a perfectly flat flooring surface without much effort from the person performing the work of a person. Due to its liquid consistency, the mixture for bulk floors spread horizontally, evenly filling all the irregularities and creating the perfect level. The Volma company began its work more than 50 years ago. The first product of gypsum plaster released by it. Now in the assortment line of the company there are dry mixtures for repair and construction.
Demand for ready -made dry mixes is growing every year, as workers appreciated the convenience of dissolving ready -made components, without selecting them in the necessary proportion. For different types of work, the requirements for the mixture differ from each other are presented. Therefore, the manufactured products differ in some key indicators. Two main types of mixtures for the bulk floor are distinguished:
The mixtures from the Volme company are presented in a wide assortment, among them two brands of rude and level of express expresses are especially distinguished.
This brand is represented by a dry mixture consisting of various components. The basis of the mixture of cement, lime with fillers from natural raw materials and chemical additions, is strengthened by fiber. The advantages of the mixture in a relatively small shrinkage, strength and high -quality adhesion to the base. The coating withstands low temperatures, is easily applied, polished and aligned, due to its plastic properties. The work is carried out for a relatively short period, since the mixture quickly freezes and forms a strong layer of coating.
The mixture is used rough during initial work as the starting finishing layer. Suitable for the base of concrete and cement, with a thickness of 10 to 80 mm, in some cases a layer of up to 100 mm is allowed. Using the mixture, repair work is carried out on the surface, eliminating cracks, as well as aligning it.
The brand is represented by a dry mixture, which is based on quartz sand with an astringent effect, thanks to it the solution is very mobile when performing work and is very durable after solidification. Using the mixture, the surfaces are aligned with a thickness of 5 to 100 mm. It is used on the basis of concrete or cement as a finish coating on which decorative elements are placed. Suitable for use in residential and industrial buildings, it is used only when indoor work. It is applied manually or using special mechanisms.
In addition to quartz sand, the mixture includes modifying additives, thanks to which the mixture after drying is very strong, and the time of work is reduced. The mixture freezes on average in 4 hours, and the load on the bulk floor is allowed after 72 hours. The working temperature of the solution is from +5 to +30 ° C. Another advantage of the products of the Volma Paul price price. The cost of packaging 20 kg on average is 6 EUR.
In general, all the products of bulk floors from the company Volmar have 4 main advantages over other brands:
As mentioned above, the bulk floors and starting mixtures of the Volma fit without much effort and create a perfectly smooth surface. But for high -quality work, it is necessary to consider all the stages of surface processing on a specific example. The first example is the laying of the wolf bulk of the Volme, the level of the express on the floor from cement from the oil painted. The irregularities in depth reached up to 1 cm and were located along the entire surface around the perimeter and at the joints of the floor of the plates. To begin with, the surface is prepared for work.
The first step in the floor cleaning. It is necessary to carefully follow so that the base is perfectly clean. The presence of stains of oil or fat, traces of paint and other contaminants, which reduce the level of clutch of the bulk floor with the surface, is especially unacceptable. On the floor, all areas that crumble or exfoliate are cleaned, or simply have a bad hitch with the base. This is necessary so that the bulk mixture does not proceed under the lower layers.
The floor is cleaned of dust and dirt, perform these works very carefully. First, dry cleaning with a vacuum cleaner or broom is carried out, and then washed the surface with a damp cloth until it is completely cleansed. The purified surface is left to dry, and then treated with primer material. This step is necessary to give the surface of a small roughness, which improves the clutch of the finish processing with the base. Optimally, non -contact soil or any other that the manufacturer of the bulk floor is recommended for these works. The primer is applied to the surface with a brush or roller. When working on a large surface, it is optimal to use a roller, this will help to significantly reduce the time of work.
The room in which the floor will be poured is carefully prepared. This consists in ensuring optimal conditions for the performance of work. The created conditions must be preserved until the already flooded floor is completely solidified in order to ensure its strength. In the room, the negative air temperature is unacceptable, the optimal indicator is from +5 to +25 ° C. The windows and doors in the room are closed tightly and ensure their tightness, in order to avoid drafts. During the drying of the mixture, drafts are also unacceptable.
After preparing the surface, a solution for filling is prepared. The packaging of the mixture necessarily contains an instruction that explains in detail how to breed it. In this particular example, the floors were prepared as follows:
When stirring, the mixture is carefully monitored that it does not contain clots and lumps, has a homogeneous structure and consistency. The mixture is prepared 15-20 minutes before the work. With debut pouring, it is not recommended to immediately breed the entire volume of the mixture. It is more rational to cook it gradually, training in small portions. If you dilute the mixture with hot water, its setting time will decrease. Pouring more fluids in powder than the manufacturer recommends, the risk of reducing the strength of the finished floor increases.
To fill the solution on the floor, you will need a set of tools:
The mixture begins to pour from the farthest relative to the entrance of the angle of the room. The fill algorithm looks like this:
The Volma Rasmoor Halm, the flow rate has 4 kg per 1 m2, provided that the thickness of the layer is 5-7 mm. About 8 bags of dry mixture are needed in the room with a quadrature of 40 m. One bag contains 20 kg of product, that is, 160 kg of dry mixture for the floor is needed for the room. The surface will completely grasp after 8-10 hours, and loading it with furniture and other elements is allowed only after 2-3 days.
Preparatory work for laying a rude tolete does not differ from the likes for laying a bulk floor:
The conditions for the performance of work also do not differ from 5 to 30 ° C, the absence of drafts. The primer for the surface of the concrete is selected universal, for bases with a high indicator of absorption of aqua moisture. If necessary, the primer is applied in two layers with a temporary interval between work at 2 hours. The gap between the primer and the installation of the floor is 1 hour. These indicators are relevant only for rooms with normal humidity, for rooms with high humidity, time increases.
Algorithm for laying the equalizer:
At temperature mode in the room, about +20 ° C becomes suitable for operation 7 hours after laying. Completely the screed dries only after 3-4 weeks. The floor is allowed to decorate, 3.5-5 days after pouring the floor. The spinning floor of the Volma is easily and very simply fits, reviews from consumers only confirm its practicality and quality.
Used the alignment,
He used the alignment when he did the repair of the house - a good mixture, no complaints about quality! The domestic manufacturer is pleasantly surprising.
The leveling is perfectly spreading,
The leveling is perfectly spreading, it is very pleasing, as well as the ability to operate the floor on the full after a couple of days.
After the winter, cracks went on
After the winter, cracks throughout the floor here are the result https://youtu.be/pzj-d7a0zhe
If more than 4 centimeters
If more than 4 centimeters pour over the overlapping floor how long it takes to dry