Site search

 

 
.

In recent years, the ceiling is gaining more and more popularity by decorative ...

.

In order for the strip foundation to serve as a reliable support to the house for as long as possible ...

.

Due to the presentability of the appearance, the metal roof is enough ...

Do -it -yourself

If you did not make the door to order, then the door frame will almost always be smaller than the thickness of the wall. That space that remains is necessary to lead to a normal form. Some make plaster slopes, others plastic. But the simplest, and easy -to -install way will be installed in the way. This simple process among a professional takes up to a maximum of two hours and this despite the fact that you need to wait until the foam dries. Installation can be carried out independently or invite a specialist.

Content

  1. What are dobages?  video
  2. Installation of submission
  3. Installation of a good door  video

What are dobages?

Doors manufacturers, like various construction stores, always offer to purchase accessories and framing elements with a door leaf and a box: dobes and platbands.

In fact, it is a preference of a strip with a rectangular cross section, designed to increase the width of the door box and its output into the wall plane.

Dobed are made of a wood array, MDF, FEP, chipboard. A thin layer of lamination or veneer is a coating for dobctions, in the case of using a wood array, the coating may be absent. LKM must be applied after the installation of the good. Dobges can be made independently using a dressed board, a parquet board or chipboard if these materials remained after repair. In the absence of this material, it is better to buy ready -made dose, the price of them will be lower than packaging of the parquet board, and the aesthetic appearance is better.

DOBORTS make two types:

  • a simple bar with a width of 70-200 mm, 10-16mm thick, the side side can be covered with an edge or without it;
  • the telescopic dialing panels are manufactured using spike-paz technology, which allows you to dial the desired width of the input for any wall thickness.

Installation of submission

Perfectly even walls are very rare. In most cases, a wedge is formed between the door box and the wall. Therefore, the marking of the input must be carried out in fact only when the door is installed. At the same time, it is necessary to measure each bar separately.

Important: Remember if there is a selected quarter for preference on the box, measure the measurements from the depths of a quarter.

If you get a wedge when marking, you need to cut it out, given this. For marking as a ruler, you can use a second additional. When producing the cost must be careful and observe the marginal accuracy. If you work yourself, use small clamps to fix the conditional line when marking the input to avoid displacement.

The compound of the inhibitors is carried out in three ways of the form of the letter P:

  • with resting crossing the racks;
  • the upper horizontal bar is located between vertical reaches;

  • with a nozzle at an angle of 45.

If you carry out the installation of inhibitory with your own hands and you do not have a end saw with a rotation function of a saw disk, the last option is better not to consider.

Carefully follow the cleanliness of the floor during the measurement of the inhibits. A small sliver can negate all efforts. Set to set on the level of the finish coating or minus.

Dobges can be installed both individually and by collecting in a finished P-shaped frame. When collecting the P-shaped frame, connect the elements with each other with thin finish nails with preliminary sparkling of the input.

The use of self -tapping screws for dobctions from MDF and FEP is not desirable, since they can split the product, even when drilling. If you use telescopic dates and at the same time the cross -country rests on the rack, it is necessary to make a groove in the cross member to install a telescopic platband.

So that the product does not leave and hold the geometry well, it is necessary to additionally fix with tape.

Having installed the inhibits of a quarter, the joints of the inhibitors from the inside must be tore off, and also press the additional lining to a quarter to avoid cracks.

If the door box is not provided for not a quarter installation of the input goes directly to the box. To fix the good use glue. Drop the preference with small stripes every 10-15 cm. When the foam dries and expands, it will completely fill the left cavities.

If you use too much foam, it can take out the advice. If you are not sure of the quality of the foam and how to properly dump the preference, it is better to use spacers.

During the installation of telescopic intake, the platband is tightly installed in the groove. Additionally, sitting the platband itself on foam or glue is not necessary. It is enough to glue the edge of the platband on the liquid nails to the wall. If there is a need to remove the platband once, it will be easier and easier to do without damaging it. It will also allow you to use it again.

Installation of a good door

The installation of a good -in -line doors on the input door does not differ from the installation of dates on interior doors.

Dobges sit on foam, which holds them in place. For reliability, it is necessary to attach dobes to the door box with glue, liquid nails are perfect for this purpose. The joints of the inhibits must be broken to avoid the appearance of cracks.

 

 
0

 

Comments

(IF You're a Human, Don 'Change the Following Field)
YOUR FIRST NAME.
Anonymous ( fast registration on the site)

healthy

healthy